Cost of Constructing a 75 Square Yard House

28 x 40 House Design front elevation

Welcome to an enlightening dive into the realm of building expenses, this time focused on the distinctive 75 square yard house. We set out to unravel the financial factors that go into designing a house that fits these compact proportions in this blog.

Even though a 75 square yard house is considered small, it requires careful planning and precise construction. Knowing these cost dynamics is essential to realising your vision without going over budget, whether you’re a first-time house builder or someone trying to optimise space.

This breakdown provides a thorough picture of the entire expenditures associated with building a 75 square yard house in 2024 because it accounts for both the grey structural and finishing costs. Remember that these are only estimates, and that actual costs could change depending on factors like the quality of the building, the specifications of the plot, the location of the city, the nature of the soil, the materials selected, and the possibility of pilferage. Consider the possibility of rising building material prices in Pakistan if you intend to begin construction later than expected.

Please be aware that real numbers could change based on a range of circumstances and factors that affect building costs. Please review this article, where we have discussed all of the expenses you should be aware of, to get a sense of all those elements. (Insert link)

To start, let’s first determine the square footage for this 75 square yard house and outline the corresponding grey structure and finishing costs per square foot.

GROUND FLOOR COVERED AREA562.5
FIRST FLOOR COVERED AREA475
SECOND FLOOR COVERED AREA250
GREY STRUCTURE BASEMENT/ SQ FT.3800
GREY STRUCTURE OTHERS/ SQ FT.2700
A QUALITY FINISHES PER SQ. FT3600
PREMIUM QUALITY FINISHES PER SQ FT.4400

Once we work out the constructed area for each storey, calculating the total areas for single-storey, double-storey, and even triple-storey houses becomes a straightforward process.

StoriesTotal Constructed Area
Single Storey (GF)562.5 square feet
Double Storey (GF + FF)1,037.5 square feet
Triple Storey (GF + FF +SF) 1,287.5 square feet

Let’s now delve into the construction costs:

Cost of a Single-Storey 75 square yard House:

  • Grey Structure: Rs. 1,518,750
  • Finishing with A-quality Finishes: Rs. 2,025,000
  • Finishing with A+ quality finishes: Rs. 2,475,000

For a 75 square yard house with complete grey structure and A-quality finishing, the cost is Rs. 3,543,750. Opting for A+ quality finishes will raise the total to Rs. 3,993,750.

Cost of a Double-Storey 75 square yard house (Ground and First Floors):

  • Grey Structure: Rs. 2,801,250
  • Finishing with A-quality Finishes: Rs. 3,735,000
  • Finishing with A+ quality finishes: Rs. 4,565,000

For a 75 square yard double-storey house with A-quality finishing, the cost amounts to Rs. 6,536,250. Opting for A+ quality finishes will increase the total to Rs. 7,366,250.

Cost of a Triple-Storey 75 square yard house (Ground, First, and Second Floor):

  • Grey Structure: Rs. 3,476,250
  • Finishing with A-quality Finishes: Rs. 4,635,000
  • Finishing with A+ quality finishes: Rs. 5,665,000

For a 75 square yard triple-storey house with complete grey structure and A-quality finishing for the ground, first, and second floor, the cost is Rs. 8,111,250. Opting for A+ quality finishes increases the total to Rs. 9,141,250.

For more insightful content and interior designs, visit our website, and don’t forget to explore our YouTube channel for videos on construction costs.

https://www.youtube.com/@GharPlansPakistan

Join The Discussion

Compare listings

Compare