LogoGP DESIGN & BUILD
Design
Construction
Shop
Cost Comparison
Blog
Services
Contact Us
© GharPlans Pakistan+92 315 5111119, +92 339 5111 199info@gharplans.pk
Concealed tank installation during Grey structure
1/1

Plumbing Grey

Concealed tank installation during Grey structure

Overview

his image shows a concealed commode tank installation during the grey structure phase of construction. The tank is securely fixed within a sturdy metal frame against the wall, ensuring durability and proper support for a future wall-hung commode. A green PPR pipe is connected to the top inlet, supplying water to the cistern, while the white outlet at the bot…