For those considering the construction of a 62.5 square yard house in Pakistan, grasping the associated costs is vital for effective planning and budgeting. This article delves into the expenses related to building a 62.5 square yard house, encompassing both the grey structure and finishing options. We will analyze costs for the grey structure, A-quality finishing, and premium-quality finishing for single, double, triple, and even four-Storey houses.
Covered Area Breakdown for a 62.5 Square Yard House:
The total covered area for each floor of a 62.5 square yard house is approximately calculated as follows:
- Ground Floor: 562.5 sq ft
- First Floor: 475 sq ft
- Second Floor: 250 sq ft
As more floors are added, the covered area increases, impacting both the grey structure and finishing costs.
Cost Breakdown:
- Grey Structure: This phase covers the essential construction work, including the foundation, walls, and roofing, but excludes any finishing touches like paint or tiles.
- A-Quality Finishing: This mid-range option employs good-quality materials for features such as flooring, wall paint, doors, windows, and bathroom fixtures.
- Premium Quality Finishing: This involves using high-end materials for a more luxurious appearance, including premium tiling, top-quality paint, and upscale fittings and fixtures.
Single Storey House
- Covered Area: 562.5 sq ft
- Grey Structure:
- PKR 1,462,500
- A-Quality Finishing:
- PKR 1,968,750
- Premium Quality Finishing:
- PKR 2,418,750
Double Storey House (Ground + First Floor)
- Covered Area: 1,038 sq ft (562.5 sq ft ground floor + 475 sq ft first floor)
- Grey Structure:
- PKR 2,697,500
- A-Quality Finishing:
- PKR 3,471,250
- Premium Quality Finishing:
- PKR 4,461,250
Triple Storey House (Ground + First + Second Floor)
- Covered Area: 1,338 sq ft (562.5 sq ft ground floor + 475 sq ft first floor + 250 sq ft second floor)
- Grey Structure:
- PKR 3,337,500
- A-Quality Finishing:
- PKR 4,506,250
- Premium Quality Finishing:
- PKR 5,336,250
Cost Per Floor Breakdown:
Each floor in a 62.5 square yard house contributes to the overall cost. Here’s a detailed look at the cost per floor:
- Ground Floor (562.5 sq ft):
- Grey Structure: PKR 1,462,500
- A-Quality Finishing: PKR 1,968,750
- Premium Quality Finishing: PKR 2,418,750
- First Floor (475 sq ft):
- Grey Structure: PKR 1,235,000
- A-Quality Finishing: PKR 1,662,500
- Premium Quality Finishing: PKR 2,042,500
- Second Floor (250 sq ft):
- Grey Structure: PKR 650,000
- A-Quality Finishing: PKR 875,000
- Premium Quality Finishing: PKR 1,075,000
Total Construction Costs:
Here’s a summary of the total construction costs for a 62.5 square yard house:
- Single Storey House: PKR 3,881,250 to PKR 5,093,750
- Double Storey House: PKR 6,328,750 to PKR 7,158,750
- Triple Storey House: PKR 7,853,750 to PKR 8,883,750
Conclusion:
Building a 62.5 square yard house in Pakistan can range from cost-effective to luxurious, depending on your choice of finishes and the number of floors. With the grey structure forming the base, selecting A-quality or premium-quality finishes enhances both the value and aesthetic appeal of your home. Whether you’re constructing a single, double, or triple-Storey residence, careful planning will ensure you stay within your budget while achieving the desired style and quality.
For further design updates please visit our YouTube Channel: