Building an 87.5 square yard house offers a variety of cost options based on both the layout and finish quality. Each additional story, from a single ground floor to a full four-story structure, expands the covered area and total construction cost. Homeowners can select between basic grey structures and high-end premium finishes, each impacting the final budget in distinct ways.
The following data provides a breakdown of construction costs for an 87.5 square yard house with varying layouts and finish levels. Grey structure construction represents the lowest cost, while premium finishes significantly raise expenses. Adding more stories increases both covered area and overall cost.
Approximate Covered Area per Floor
- Basement Floor: 787.5 sq. ft.
- Ground Floor: 788 sq. ft.
- First Floor: 600 sq. ft.
- Second Floor: 500 sq. ft.
- Grey Structure Cost (Basement/Ground/First/Second): PKR 2,600 per sq. ft.
- A-Grade Finishing Cost per sq. ft.: PKR 3,500 per sq. ft.
- Premium Finishing Cost per sq. ft.: PKR 4,300 per sq. ft.
Square Feet Area by Configuration
The total covered area varies depending on the house’s configuration:
- Single Story: Ground Floor only
- Double Story: Either Ground + First Floor or Basement + Ground
- Triple Story: Ground + First + Second Floor or Basement + Ground + First
- Four Story: Basement + Ground + First + Second Floor
Cost Estimates by House Type
Each configuration includes estimates for three construction levels:
- Grey Structure: Basic shell construction with no finishes
- A-Grade Finishing: Mid-tier quality finishes
- Premium Finishing: High-end, luxury finishes
Single-Story House (Ground Floor Only)
- Grey Structure: PKR 2,047,500
- A-Grade Finishing: PKR 2,756,250
- Premium Finishing: PKR 3,386,250
Double-Story House (Basement + Ground or Ground + First Floor)
- Basement + Ground:
- Grey Structure: PKR 4,095,000
- A-Grade Finishing: PKR 5,512,500
- Premium Finishing: PKR 6,772,500
- Ground + First Floor:
- Grey Structure: PKR 3,607,500
- A-Grade Finishing: PKR 4,785,000
- Premium Finishing: PKR 5,566,250
Triple-Story House (Basement + Ground + First or Ground + First + Second Floor)
- Basement + Ground + First Floor:
- Grey Structure: PKR 6,142,500
- A-Grade Finishing: PKR 8,268,750
- Premium Finishing: PKR 10,158,750
- Ground + First + Second Floor:
- Grey Structure: PKR 5,655,000
- A-Grade Finishing: PKR 7,541,250
- Premium Finishing: PKR 9,152,500
Four-Story House (Basement + Ground + First + Second Floor)
- Grey Structure: PKR 8,202,500
- A-Grade Finishing: PKR 10,797,500
- Premium Finishing: PKR 13,023,750
This analysis provides an estimate of construction costs for an 87.5 square yard house, factoring in layout and finishing quality. Covered area ranges from 788 sq. ft. for a single-story home to 2,675.5 sq. ft. for a four-story home. Grey structures are the most economical, while premium finishes provide a more luxurious option at a higher price.