Cost of Construction: 15 Marla

Building a home is a significant commitment, and it is critical to have a thorough understanding of the associated costs before beginning the process. Each stage of building, from laying the foundation to adding the finishing touches, increases the entire cost. In this article, we will break down the anticipated costs associated with building a 15 Marla house, taking into account factors such as material quality and number of stories.

To begin, it’s vital to outline the main components of this construction project:

Covered Areas: The home will have a basement, ground level, first story, and possibly a second Storey.

Quality Options: The expenses are classified into three categories: budget, A Quality, and Premium Quality.

Finishing Options: The final touches, such as flooring, paint, and fixtures, available in a variety of quality levels, which all influence the ultimate cost.

The foundation, walls, and roof make up the basic component of a house, known as the gray structure. The budget for this phase is impacted by excavation requirements, material quality, and the complexity of the structural design. A basement costs approximately PKR 3,500 per square foot due to the need for excavation and waterproofing. Furthermore, the grey structure’s above-ground levels are less expensive, costing only 2,600 PKR per square foot. Finishing costs emerge after construction begins and can vary greatly depending on the materials utilized. Premium finishes, such as imported tiles and high-end fixtures, can cost up to PKR 4,300 per square foot, although a solid A grade finish with mid-range materials and fittings is normally around PKR 3,500 per square foot.

Covered Areas:

Basement: 1265 sq ft.

Ground Floor: 2350 sq ft.

First Floor: 1895 sq ft.

Cost Breakdown

Grey Structure: This stage includes the house’s structure (base, walls, and roof). The price varies according to the quality and whether a basement is included.

Finishing: Following structural work, the finishing phase includes flooring, fittings, paint, and other elements. The quality chosen at this stage has a considerable impact on the final cost.

By breaking down the projected areas for each level, we can get a better idea of the building costs. 

Cost Estimates for Various House Types:

  • Single-Story House (Ground Floor Only):

Grey Structure: PKR 6,578,000

A-Grade Finish: PKR 8,855,000

Premium Quality Finish: PKR 10,879,000

Total with A-Grade Finish: PKR 15,433,000

Total with Premium Finish: PKR 17,457,000

  • Double-Story House (Basement and Ground Floor):

Grey Structure: PKR 11,005,000

A-Grade Finish: PKR 13,252,500

Premium Quality Finish: PKR 16,318,500

Total with A-Grade Finish: PKR24,288,000

Total with Premium Finish: PKR 27,324,000

  • Double-Story House (Ground and First Floors):

Grey Structure: PKR 11,505,000

A-Grade Finish: PKR 15,487,500

Premium Quality Finish: 19,027,500

Total with A-Grade Finish: PKR 26,992,500

Total with Premium Finish: PKR 30,532,500

  • Triple-Story House (Basement, Ground Floor, and First Floor):

Grey Structure: PKR 15,932,500

A-Grade Finish: PKR 19,915,000

Premium Quality Finish: PKR 24,467,000

Total with A-Grade Finish: PKR 35,847,500

Total with Premium Finish: PKR 40,399,500

Triple-Story House (Ground, First Floor & Second):

Grey Structure: PKR 12,545,000

A-Grade Finish: PKR 16,887,500

Premium Quality Finish: PKR 20, 747,500

Total with A-Grade Finish: PKR 29,432,500

Total with Premium Finish: PKR 33,282,500

The following is a summary of the cost estimates for a 15 MARLA Home:

For a single-story house (ground floor only), the grey framework costs PKR 6,578,000, with A-grade finishes costing an additional PKR 8,855,000 and premium finishes costing PKR 10,879,000. The entire cost for A-grade finishes is PKR 15,433,000, while the premium finish costs PKR 17,457,000.

The grey structure for a double-story house with a basement and ground floor costs PKR 11,005,000, while A-grade finishes cost PKR 13,252,500 and premium finishes cost PKR 16,318,500. The overall cost with A-grade finishing is PKR 24,288,000, while premium finishes are PKR 27,324,000.

For a double-story house with ground and first floors, the gray framework costs PKR 11,505,000, while A-grade finishes cost PKR 15,487,500 and premium finishes cost PKR 19,027,500. The entire cost for A-grade finishes is PKR 26,992,500, while premium finishes are PKR 30,532,500.

A grey framework for a three-story house with a basement, ground floor, and first floor costs PKR 15,932,500, while A-grade finishes cost PKR 19,915,000 and premium finishes cost PKR 24,467,000. The overall cost with A-grade finishing is PKR 35,847,500, while premium finishes are PKR 40,399,500.

For a three-story house with a ground, first, and second floors, the gray framework costs PKR 12,545,000, A-grade finishing cost PKR 16,887,500, and premium finishes cost PKR 20,747,500. The overall cost for A-grade finishes is PKR 29,432,500, while the premium finish is PKR 33,282,500.