Total Cost of Construction 26 Marla House

10 Marla Home Design in Mediterranean Style free of cost feature

The cost of constructing a 26 Marla house is divided into two main phases: the grey structure and the finishing stage. The grey structure forms the foundation of the house and includes excavation, brickwork, cement, steel, roofing, and basic plumbing and electrical installations. It sets the structural integrity and framework of the building. The finishing stage, on the other hand, focuses on aesthetics and functionality, covering flooring, paint, woodwork, fixtures, and utilities. Both phases significantly contribute to the overall cost, with material quality and labor charges playing a key role. Proper budgeting and planning are essential for achieving a durable and visually appealing home.

Let’s now work out the approximate covered areas in square feet per floor that we would see in a 26 Marla house and based on the rates given in the table we will work out all the associated costs.

COVERED AREA & RATES
BASEMENT FLOOR COVERED AREA3700
GROUND FLOOR COVERED AREA4200
FIRST FLOOR COVERED AREA3500
SECOND FLOOR COVERED AREA500
BASEMENT GREY STRUCTURE BUDGET/ SQ FT.4000
GREY STRUCTURE BUDGET HOUSE OTHER/ SQ FT.2900
BASEMENT GREY STRUCTURE GOOD/ SQ FT.4500
GREY STRUCTURE GOOD HOUSE OTHER/ SQ FT.3200
BUDGET FINISHES/ SQ FT.4000
A QUALITY FINISHES/ SQ FT.5000
PREMIUM QUALITY FINISHES6000

Let’s calculate the house cost for budget, A quality & premium quality house.

SINGLE STOREY BUDGET HOUSE

SINGLE STOREY BUDGET HOUSEGREY STRUCTUREFINISHING
 GROUND FLOOR             12,180,000                     16,800,000
 TOTAL             12,180,000                     16,800,000
The total cost for budget single storey house is 28,980,000.
SINGLE STOREY A QUALITY HOUSEGREY STRUCTUREFINISHING
GROUND FLOOR             13,440,000                     21,000,000
 TOTAL             13,440,000                     21,000,000
The total cost for A Quality single Storey house is 34,440,000.
SINGLE STOREY PREMIUM QUALITY HOUSEGREY STRUCTUREFINISHING
GROUND FLOOR             13,440,000                     25,200,000
 TOTAL             13,440,000                     25,200,000
The total cost for Premium Quality single Storey house is 38,640,000.

NON BASEMENT DOUBLE STOREY BUDGET HOUSE

NON BASEMENT DOUBLE STOREY BUDGET HOUSEGREY STRUCTUREFINISHING
GROUND FLOOR             12,180,000                     16,800,000
FIRST FLOOR             10,150,000                     14,000,000
TOTAL             22,330,000                     30,800,000
The total cost for budget NON-BASEMENT DOUBLE STOREY house is 53,130,000.
NON BASEMENT DOUBLE STOREY A QUALITY HOUSEGREY STRUCTUREFINISHING
GROUND FLOOR             13,440,000                     21,000,000
FIRST FLOOR             11,200,000                     17,500,000
TOTAL             24,640,000                     38,500,000
The total cost for A Quality NON-BASEMENT DOUBLE STOREY house is 63,140,000.
NON BASEMENT DOUBLE STOREY PREMIUM HOUSEGREY STRUCTUREFINISHING
GROUND FLOOR             13,440,000                     25,200,000
FIRST FLOOR             11,200,000                     21,000,000
TOTAL             24,640,000                     46,200,000
The total cost for Premium Quality NON-BASEMENT DOUBLE STOREY house is70,840,000.

BASEMENT DOUBLE STOREY BUDGET HOUSE

BASEMENT DOUBLE STOREY BUDGET HOUSEGREY STRUCTUREFINISHING
BASEMENT FLOOR             14,800,000                     14,800,000
GROUND FLOOR             12,180,000                     16,800,000
TOTAL             26,980,000                     31,600,000
The total cost for budget BASEMENT DOUBLE STOREY house is 58,580,000.
BASEMENT DOUBLE STOREY A QUALITY HOUSEGREY STRUCTUREFINISHING
BASEMENT FLOOR             16,650,000                     18,500,000
GROUND FLOOR             13,440,000                     21,000,000
TOTAL             30,090,000                     39,500,000
The total cost for A Quality BASEMENT DOUBLE STOREY house is 69,590,000.
BASEMENT DOUBLE STOREY PREMIUM HOUSEGREY STRUCTUREFINISHING
BASEMENT FLOOR             16,650,000                     22,200,000
GROUND FLOOR             13,440,000                     25,200,000
TOTAL             30,090,000                     47,400,000
The total cost for Premium Quality BASEMENT DOUBLE STOREY house is 77,490,000.

BASEMENT TRIPLE STOREY BUDGET HOUSE

BASEMENT TRIPLE STOREY BUDGET HOUSEGREY STRUCTUREFINISHING
 BASEMENT FLOOR             14,800,000                     14,800,000
 GROUND FLOOR             12,180,000                     16,800,000
 FIRST FLOOR             10,150,000                     14,000,000
TOTAL 37,130,000 45,600,000
The total cost for budget BASEMENT TRIPLE STOREY house is 82,730,000.
BASEMENT TRIPLE STOREY A QUALITY HOUSEGREY STRUCTUREFINISHING
 BASEMENT FLOOR             16,650,000                     18,500,000
 GROUND FLOOR             13,440,000                     21,000,000
 FIRST FLOOR             11,200,000                     17,500,000
 TOTAL             41,290,000                     57,000,000
The total cost for A Quality BASEMENT TRIPLE STOREY house is 98,290,000.
BASEMENT TRIPLE STOREY PREMIUM QUALITY HOUSEGREY STRUCTUREFINISHING
 BASEMENT FLOOR             16,650,000                     22,200,000
 GROUND FLOOR             13,440,000                     25,200,000
 FIRST FLOOR             11,200,000                     21,000,000
 TOTAL             41,290,000                     68,400,000
The total cost for Premium Quality BASEMENT TRPLE STOREY house is 109,690,000.

BASEMENT TRIPLE STOREY BUDGET HOUSE WITH MUMTY

BASEMENT TRIPLE STOREY BUDGET HOUSE WITH MUMTYGREY STRUCTUREFINISHING
 BASEMENT FLOOR             14,800,000                     14,800,000
 GROUND FLOOR             12,180,000                     16,800,000
 FIRST FLOOR             10,150,000                     14,000,000
 SECOND FLOOR               1,450,000                       2,000,000
 TOTAL             38,580,000                     47,600,000
The total cost for budget BASEMENT TRIPLE STOREY house with mumty is 86,180,000.
BASEMENT TRIPLE STOREY A QUALITY HOUSE WITH MUMTYGREY STRUCTUREFINISHING
 BASEMENT FLOOR             16,650,000                     18,500,000
 GROUND FLOOR             13,440,000                     21,000,000
 FIRST FLOOR             11,200,000                     17,500,000
 SECOND FLOOR               1,600,000                       2,500,000
 TOTAL             42,890,000                     59,500,000
The total cost for A Quality BASEMENT TRIPLE Story house with mummty is 102,390,000.

BASEMENT TRIPLE STOREY PREMIUM HOUSE WITH MUMTYGREY STRUCTUREFINISHING
 BASEMENT FLOOR             16,650,000                     22,200,000
 GROUND FLOOR             13,440,000                     25,200,000
 FIRST FLOOR             11,200,000                     21,000,000
 SECOND FLOOR               1,600,000                       3,000,000
 TOTAL             42,890,000                     71,400,000
The total cost for PREMIUM BASEMENT TRIPLE Story house with mumty is 114,290,000.

In conclusion, the cost of constructing a 26-marla house, encompassing both the grey structure and finishing stages, is a significant investment that requires careful planning and execution. The grey structure ensures the durability and strength of the building, while the finishing stage enhances its functionality and aesthetic appeal. By selecting high-quality materials, skilled labor, and practical yet elegant designs, homeowners can achieve the perfect balance between durability and beauty. Proper budgeting and expert guidance throughout both phases are essential to avoid unexpected costs and ensure a seamless construction process, resulting in a comfortable and visually appealing home.

For further design updates please visit our YouTube Channel :

GP Design & Construction – YouTube

Join The Discussion

Compare listings

Compare